Thames Tunnel
World Architecture
Thames Tunnel
London, England
The Thames Tunnel was designed by the French-born engineer Marc Isambard Brunel and supervised by his son Isambard Kingdom Brunel between 1825 and 1843. The approximately 1,200-foot-long (365-meter) structure runs under the River Thames between Wapping on the north bank and Rotherhithe on the south in east London. Originally used for foot traffic, it now forms part of the London Underground system. The first tunnel ever built through the soft ground under a river, and the forerunner of modern tunneling techniques (including that used for the Channel Tunnel), it is widely recognized as a landmark feat of civil engineering.
In 1798 one Ralph Todd had tried to build a tunnel under the Thames, further downstream between Gravesend and Tilbury, but the venture failed for financial and other reasons. In 1807, Robert Vazie and Richard Trevithick also attempted to construct a timbered tunnel. In January 1808 the river broke through. The hole was plugged with clay, the tunnel cleared, and work restarted, but a similar accident occurred a month later, when excavation was almost complete. Fearing that more clay dumping would endanger shipping, the authorities called a halt to the project. By about 1815 most of Londons docks were near Rotherhithe, while industry was springing up around Wapping. The nearest fixed crossing was London Bridge, about 2 miles (3.2 kilometers) upstream, and by about 1815 nearly 4,000 people a day were ferried in small boats; goods had to be taken on a costly, time-wasting detour over the bridge.
In 1818 Marc Brunel patented his tunneling shield, enabling tunnels to be excavated by a technique commonly employed in coal mines, that is, by sinking vertical shafts and digging from within the shield. The 88-ton (80-tonne) cast-iron structure, built by Henry Maudley, consisted of twelve 3-foot-wide (0.9-meter) sections, each with, three compartments in which a man could work. It had a closed face, and at the front, angled jacks held horizontal timber boards in place. The tunneler removed the boards one by one and dug out 4.5 inches (11 centimeters) of soil, replacing the jacks against the board in a forward position. When the entire face had been excavated, the shield assembly was edged forward by the use of screw jacks, and brickwork lining was built behind it. Most contemporary tunnels were built using the cut and cover
Hezekiahs Tunnel
Roman concrete construction
Industrialized building
Temple of the Inscriptions
Golden Gate Bridge
Afsluitdijk
St Peters Basilica
San Paolo fuori la Mura St Pauls outside the Walls
Cahokia mounds
Shell concrete
Nazca Lines
St Pancras Station
Test your English Language
Musical Instruments
Tips to Remove Pimples on Face
Emperor Ashoka
Benefits of Hair Straightening
RavindraNath Tagore
Daily Meditation can Improve your Life
Myth about Airplanes
Myth about Accounting
Precautions while using Touch Screen Mobile
Precautions while using UPS
Precautions while using Washing Machine




