Mobsea Logo
Home

Thames Tunnel

World Architecture

<
^
>

Thames Tunnel

London, England
The Thames Tunnel was designed by the French-born engineer Marc Isambard Brunel and supervised by his son Isambard Kingdom Brunel between 1825 and 1843. The approximately 1,200-foot-long (365-meter) structure runs under the River Thames between Wapping on the north bank and Rotherhithe on the south in east London. Originally used for foot traffic, it now forms part of the London Underground system. The first tunnel ever built through the soft ground under a river, and the forerunner of modern tunneling techniques (including that used for the Channel Tunnel), it is widely recognized as a landmark feat of civil engineering. In 1798 one Ralph Todd had tried to build a tunnel under the Thames, further downstream between Gravesend and Tilbury, but the venture failed for financial and other reasons. In 1807, Robert Vazie and Richard Trevithick also attempted to construct a timbered tunnel. In January 1808 the river broke through. The hole was plugged with clay, the tunnel cleared, and work restarted, but a similar accident occurred a month later, when excavation was almost complete. Fearing that more clay dumping would endanger shipping, the authorities called a halt to the project. By about 1815 most of Londons docks were near Rotherhithe, while industry was springing up around Wapping. The nearest fixed crossing was London Bridge, about 2 miles (3.2 kilometers) upstream, and by about 1815 nearly 4,000 people a day were ferried in small boats; goods had to be taken on a costly, time-wasting detour over the bridge. In 1818 Marc Brunel patented his tunneling shield, enabling tunnels to be excavated by a technique commonly employed in coal mines, that is, by sinking vertical shafts and digging from within the shield. The 88-ton (80-tonne) cast-iron structure, built by Henry Maudley, consisted of twelve 3-foot-wide (0.9-meter) sections, each with, three compartments in which a man could work. It had a closed face, and at the front, angled jacks held horizontal timber boards in place. The tunneler removed the boards one by one and dug out 4.5 inches (11 centimeters) of soil, replacing the jacks against the board in a forward position. When the entire face had been excavated, the shield assembly was edged forward by the use of screw jacks, and brickwork lining was built behind it. Most contemporary tunnels were built using the cut and cover


<
^
>

BART Bay Area Rapid Transit
Nazca Lines
Parthenon
Reichstag
Menai Suspension Bridge
Sigiriya Lion Mountain
Temple of the Inscriptions
Airship hangars
Airplane hangars
Skyscrapers
Menier chocolate mill
Marib Dam
More ...


Test your English Language
The Top 15 Manliest Movies Ever Made
Mahashivratri Festival
River Rafting
Precautions while using X Rays
Boss Day
Atal Bihari Vajpayee
The worlds Fastest Limousine
Amazing Pictures
Save Electricity
Weird Olympic Sports
Ranking All NFL Teams From Least To Most Valuable
Healthy Forehead
The Most Powerful People In Enterprise Tech
Valentines Day Lyrics
Hanuman Chalisa
Best Lottery Games of the World
Best Marwari Mehndi Designs
Best Mobile phones in the World