Two channel operation
Precautions while using Cathode Ray Oscilloscope
Two channel operation
1. Connect the signal generator 1 kHz, 1 V to the input and ground of the driver
box provided.
2. Connect output one of the box to channel 1 of the oscilloscope and output 2 to
channel 2. It is essential that the two earthed sides are connected to each other
and to the earthed connection of the generator, if one exists . Failure to observe
this rule will result in part of the circuit under investigation being shorted out.
3. Set the oscilloscope to display both channels 1 and 2 DUAL display mode. On
some oscilloscopes this requires two buttons to be depressed simultaneously.
4. Set both channel couplings to AC, and adjust the gain and position of channel 2 in
order to display both traces.
Measurements of voltage
Dual beam oscilloscope
Aim
Connecting the cro to the circuit
Switching the cro on
Checking that the cro is triggered correctly
Horizontal sweep section
Heat light and sound
Familiarisation with the main oscilloscope controls
Some simple oscilloscope experiments
Phase measurement using lissajous patterns
Objective More ...
Test your English Language
Precaution while using Microscope
The Best bits of Brazil
Barack Obama
Party Games
Fashion Designer Cars in the world
Tips for Valentines day Gift
Healthy Blood
Healthy Breakfast
Healthy Brow




