Two channel operation
Precautions while using Cathode Ray Oscilloscope
Two channel operation
1. Connect the signal generator 1 kHz, 1 V to the input and ground of the driver
box provided.
2. Connect output one of the box to channel 1 of the oscilloscope and output 2 to
channel 2. It is essential that the two earthed sides are connected to each other
and to the earthed connection of the generator, if one exists . Failure to observe
this rule will result in part of the circuit under investigation being shorted out.
3. Set the oscilloscope to display both channels 1 and 2 DUAL display mode. On
some oscilloscopes this requires two buttons to be depressed simultaneously.
4. Set both channel couplings to AC, and adjust the gain and position of channel 2 in
order to display both traces.
Cro operation
How do you use an oscilloscope
Heat light and sound
Cro controls
Checking that the cro is triggered correctly
Features and controls
Use of the ac dc function
Measurements of voltage
Time base
Delayed sweep
Phase measurement using lissajous patterns
Two channel operation More ...
Test your English Language
Management Tips
Latest Sarees in bollywood
Christmas Poems
Benefits of Black raisins
Benefits of Tamarillo fruits
Facts about Plant
Wacky Ideas to attract your Partner
Most Amazing Tree Tunnels
Most Amazing Volcanoes




